MATERIALS INFORMATION

WATER CONNECTION

Description Material Unit
Connection Clamp GI/PPR No
Gate valve GI/PPR No
Barrel Nipple GI/PPR No
Socket GI/PPR No
Pipe GI/PPR No
Elbow GI/PPR No
Long Nipple GI/PPR No
Union GI/PPR No
Tee GI/PPR No
Meter Point GI/PPR No
NB: Standard Excavation Depth is 0.6-1Meter
NB: 300MM above the ground and to allow horizontal meter fixing and positioned at the Entrance or gate




SEWER CONNECTION MATERIALS

Sewer Connection Materials using Saddle Connector
Description Material Unit
Saddle Connector Concrete no
uPVC pipe m
Bend Concrete No
Cement bags
Ballast ton
Sand ton
Protective Polythene paper 500g m2
NB: Standard Excavation Depth is 1.2-1.5 M




Sewer Connection Materials for Connection into Manhole (where new manhole is required)
Description Material Unit
Concrete pipe m
Bend Concrete No
Cement bags
Ballast ton
Sand ton
Waste water Tee(For Drop Manhole) Concrete No
Manhole Ring No
Cover Slab and Triangular Cover Concrete and Plastic respectively No
NB: Standard Excavation Depth is 1.2-1.5 M




Sewer Connection Materials for Connection into existing Manhole
Description Material Unit
Concrete pipe m
Bend Concrete No
Cement bags
Ballast ton
Sand ton
Waste water Tee(For Drop Manhole) Concrete No
NB: Standard Excavation Depth is 1.2-1.5 M